|
Still deciding? Get samples of $ !
Order Sample
|
| Customization: | Available |
|---|---|
| After-sales Service: | Contact Us |
| Warranty: | Contact Us |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
We have a mature production process from raw materials to forging, heat treatment, machining, surface treatment, etc. The materials include carbon steel, alloy steel, stainless steel, aluminum and cooper. The main forging press includes 300T, 400T, 630T, 1000T, 1600T and 2500T, which covers product weight from 0.1kg to 100kg. The main machining equipment includes lathe, planer, drilling machine, tapping machine, line cutting, milling machine, CNC machining center, polishing machine etc., ensuring that we can fulfill different machining requirements from our customers.

Customized requirements are welcome!
1.Rich experience for international business
| PROOF TEST | DIMENTIONS | ||||||
| a | b | c | d | e | f | WEIGHT | |
| TON | mm | mm | mm | mm | mm | mm | kg/pc |
| 2 | 10 | 20 | 25 | 45 | 6 | 38 | 0.14 |
| 3.5 | 13 | 25 | 35 | 60 | 8 | 50 | 0.31 |
| 5.5 | 16 | 32 | 45 | 70 | 10 | 64 | 0.45 |
| 7.5 | 19 | 38 | 50 | 85 | 12 | 76 | 0.79 |
| 9.56 | 22 | 45 | 60 | 102 | 13 | 89 | 1.36 |
| 13 | 25 | 50 | 70 | 115 | 16 | 100 | 1.82 |
| 15.75 | 28 | 57 | 76 | 130 | 18 | 114 | 2.95 |
| 20 | 32 | 64 | 85 | 145 | 19 | 128 | 3.86 |
| 23.63 | 35 | 70 | 95 | 159 | 21 | 140 | 5.11 |
| 29 | 38 | 76 | 100 | 170 | 22 | 152 | 6.58 |
| 39 | 44 | 88 | 120 | 200 | 26 | 178 | 9.99 |
| 50 | 50 | 100 | 140 | 230 | 30 | 203 | 14.98 |
| Features: Forging |
| 1) Materials: carbon steel, Alloy steel, stainless steel, aluminum etc. |
| 2) Standard: JIS, DIN, ASTM, BS |
| 3) Surface treatment: Zinc Plating, Hot dipped galvanizing, Powder coating, Painting ,Shoot blasting etc. |
| 4) Weight: 0.1 -10,000kg |
| 5) Processes : Forging, CNC Machining. |
| 6) Manufacturing equipments: three die-forging product lines (3 ton stamp forging hammer product line, 1000 ton friction product line, 1250 ton press product line), various loose hammers and cylinder parts , automatic control ring forging machine, heat treatment cellar, digital control fibre natural gas car furnace, standing machine tool, machine tools, standing miller, standing drill machine, bench drill machine ,CNC machining centre etc |
| 7) Testing equipment: Supersonic inspection machine, Supersonic flaw detecting machine , physics and chemical analysis. |
| 8)Services |
| a) Also can design and manufacture forged according to the customers' requirement |
| b) ISO9001 quality control and inspection |
| c) In house & Third Parties |
| d) Ordering and warehousing |
| 9)Packing: Wooden cases or according to customers' needs |
FAQ:
1. Are you a genuine manufacturer?
Yes, all products shown on our website are produced in our ISO9001:2015 certified factory; We are also a company registered by China Customs with the right to export and import.
2. I want to keep our design confidence; can we sign NDA?
Sure, protecting customers' profit is our obligatory responsibility, signed NDA would be valid for both of us.
3. What should I offer to get your quotation?
Please offer us your detailed information for the product, such as drawings with 2D/3D by software Pro/E, Auto CAD, SolidWorks, UG etc; as well as materials, surface treatment, quantity, and package. Any special requirements should be highlighted especially for tolerance.
4. How long does it take to receive samples?
20 working days, the lead time is the general production period and does not include transportation time.
we can supply free samples with less quantity, but customers need to pay shipping costs.
5. How long is the manufacturing lead time?
Mass Production:30-45 working days after sample approval by yours.T
he lead time is the general production period without the transportation time.
We could make some special production arrangements effectively if the customer has an urgent need.
6. How long does it take to ship goods from China by sea?
It takes about 5 weeks to European ports plus 1 week for customs clearance, so you can get the container within 6 to 7 weeks.
It takes about 2 weeks to the east coast and 3 weeks to the west coast US ports. All sea goods are shipped from Qingdao/Shanghai/Ningbo Port.
7. How long does it take to ship goods from China by air?
It takes about 7 days to all major destinations.
8. What are the payment terms?
Payment terms are negotiable and will improve for long-term customers.
During the initial stages, we request 50% of the tooling fee in advance with the balance payable on acceptance of samples.
Bulk production orders can be negotiable. We prefer a 30% deposit and the balance by T/T before delivery.
9. New product development process
Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept. To ensure the developing schedule---Design mold, fixture, and gauge and make them in our factory--- mold. fixture and gauge making---producing samples---approved from customer-purchasing material-forging-heat treatment-shot blasting-machining-Inspection-package---delivery
10. Which countries do you export to?
Now main exports to the U.S.A, Germany, France, Italy, the UK, Brazil, Swedish, Japan, Korea, the Middle East of Asia, Thailand, and so on.
11. Can we visit the factory to conduct an audit?
Yes, you are welcome to visit our factory.