Shandong, China
Business Type:
Manufacturer/Factory & Trading Company
Number of Employees:
36
Year of Establishment:
2006-03-31
Management System Certification:
ISO9001:2008
Average Lead Time:
Peak season lead time: one month
Off season lead time: one month
OEM/ODM Service
Sample Available

Welding Parts, Weld Products, Welded manufacturer / supplier in China, offering Customized Zinc Coating Assembly Welded/Welding Parts of Train Parts, OEM Timing Motor Belt Pulley Tensioner Pulley/Belt Sheave Pulley, Ductile Iron Floor Drain Covers/Manhole Cast Iron/Sewer Plate Drain Covers and so on.

Gold Member Since 2014
Audited Supplier
Supplier Homepage Products Welding Parts Customized Zinc Coating Assembly Welded/Welding Parts of Train Parts

Customized Zinc Coating Assembly Welded/Welding Parts of Train Parts

Get Latest Price
Min. Order / Reference FOB Price
1,000 Pieces US $0.1-20/ Piece
Port: Qingdao, China
Production Capacity: 500ton/Month
Payment Terms: L/C, T/T, D/P, Western Union, Paypal, Money Gram
Type: Cold Stamping
Processing Type: Metal Spinning
Material: Alloy Steel
Mould: Multistep Progressive Dies
Surface Processing: Electroplating
Fine Blanking: Multi-Position

You Might Also Like

Loading...

Basic Info

Model NO.
WF-JF
Process
Separation Process
Industry
Metal Stamping Parts
Tolerances
0.01mm
Customized
Customized
Place of Origin
Shandong, China
Use
Construction and Public Use
Shape
Round, Square, etc.
Dimensions
as Your Requirement
Quality Control
100% Inspected
Advantages
Within 20 Days After Receiving Last Confirm Info
Unique
China Gold Supplier
Supply
Drawing Design
Castig Type
Sand Casting
Standard or Nonstandard
Nonstandard
Trademark
ShengAo
Transport Package
Pallet, Iron Frame, Flywood Box.
Specification
SGS
Origin
Weifang City, Shandong Province
HS Code
7325109000


Advantages:
1. We are ODM&OEM, design according to your drawing.
2. Rich experience and good technology support( have engineers with more than 20 years experience).
3. Manufacturer and Trade Company.
4. Low MOQ is accepted.
5. 100% inspection before delivery.
6. Competitive price with high quality.
7. Convenient transportation 


Customized Zinc Coating Assembly Welded/Welding Parts of Train Parts
Customized Zinc Coating Assembly Welded/Welding Parts of Train Parts





OUR PRODUCING PROCESS:
 1. Tooling (Mold) design and Manufacture.
 2. Manufacture the parts according to the Stamping Machine.
 3. Riveting, Welding or Screw tap according to Customer's require.
 4. After finish manufacture process we will test the parts by the Image measurement instrument, Caliper, Angel Gage etc.
 5. After make sure all the dimension can reach customer's require, we will make the surface treatment process.
 6. After finish surface treatment we will testing all the parts by worker so that we can make sure the parts which we sell is 100% qualified.
 7. After finish testing we will pack the parts by Vacuum Package Machine

Customized Zinc Coating Assembly Welded/Welding Parts of Train Parts

Customized Zinc Coating Assembly Welded/Welding Parts of Train Parts





 
Product type:stamping parts
Material:Stainless steel, iron, aluminum
Surface treatment:brush finish, oxidation, screen printing, laser, sand blasting, galvanized
Color:Black,Red,Yellow,Blue,Pink,Natural color
Precision tolerance:+/- 0.1
A. Raw MaterialCopper ,BeCu, phosphor copper, Brass, Stainless steel, Aluminum, SGCC, SECC, steel, spring steel, Nickel-Silver... and all different kinds of metal;
B. SPEC Roll material thickness is 0.05-10mm;sheet metal  thickness is 0.3-20mm;
C. Surface treatmentGold / Silver /Tin / Nickel / Zinc /  Chromium / Copper-plating /  Laser etching/Screen printing/Phosphating (can pass salt spray testing with 160 hours)/Black coating / Painting/ Power coating /Electrophoresis /  Passivating /Deburring /  Polishing /  Brush according to ROHS standard;
D. ApplicationAll different kinds of telecom products, loom, furniture, and so on ;
E. QuotationPlease provide the Formal drawings (normally, with DWG/STP/PDF file ),and make note with material/QTY/surface treatment and any other requirements, we will provide you the quotation sheet in 48-72 hours;
F. Prototype & MouldWe make the prototypes or moulds according to the drawings that confirmed by both of us and customers! The lead time is depends on the structure and qty of parts, Normally, lead time for prototypes is 3-15 days; lead time for mould is 10-25 days;
G. ProductionWe will provide samples according to the drawings to customers for approval. Then arrange the production  and confirm the delivery date according to the Purchase Order; Normally , the lead time for production is 5-30 days ,the structure of parts is different , the lead time will be different .
H. PackagePlastic bags; Preserving Box; Reel/tape package; Plastic tray; Wood box; Export carton and any other customized package according to the customers' requests.

Customized Zinc Coating Assembly Welded/Welding Parts of Train PartsIf you interested in any of our products, please send message to us!

Send your message to this supplier

*From:
*To:
avatar Miss Kate Jing
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now