OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler for Building Tube Pipe Material

Product Details
Customization: Available
After-sales Service: Contact Us
Warranty: Contact Us
Still deciding? Get samples of US$ 6/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
48
Year of Establishment
2022-08-15
  • OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler for Building Tube Pipe Material
  • OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler for Building Tube Pipe Material
  • OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler for Building Tube Pipe Material
  • OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler for Building Tube Pipe Material
  • OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler for Building Tube Pipe Material
  • OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler for Building Tube Pipe Material
Find Similar Products
  • Overview
  • Product Description
Overview

Basic Info.

Model NO.
WF-SA
Certification
CCC, CE, ISO
Surface Treatment
Yes
Technics
Casting
Material
Metal
Type
Fasteners
Processing Object
Metal
Molding Style
Forging
Molding Technics
Pressure Casting
Heat Treatment
Quenching
Forging Tolerance
+/-0.5mm
Standard
ASME
Brand Name
Shengao, OEM
Raw Material
Steel
Techincs
Forging
Factory
Over 15 Years′experience
Certificate
SGS, CE, ISO 9001:2008
Delivery Time
15 Days After Receiving The Payment
Service
OEM and ODM
Export Markets
Global
OEM Package
Composite Wood Box
Transport Package
Plywood Box
Specification
SGS
Trademark
ShengAo
Origin
Weifang, Shangdong, China
HS Code
8483500000
Production Capacity
50000PCS/Month

Packaging & Delivery

Package Size
10.00cm * 10.00cm * 10.00cm
Package Gross Weight
10.000kg

Product Description

Scaffolding Coupler for Construction & Building Material

Product Description

Mainly engaged in the development, production and sales of all kinds of forgings, mechanical accessories,

auto parts. The company has production department, quality inspection department, marketing department,
machining workshop, blanking workshop, heat treatment workshop, forging workshop, testing center and
physical and chemical laboratory. Through years of development, the company has made great progress,
not only Shengao Metal Parts is sold well in the US,but we have customers all over the world. Our
aftermarket parts meet OEM specifications for reliable performance, while often costing substantially 
less than OEM counterparts.

Our Metal Parts can deliver exceptional value because we offer factory direct pricing without a middleman
markup. We also stand behind the quality of our products with a full 6 months warranty.


OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler for Building Tube Pipe Material

           Equipment
           »80 sets of CNC turning machines;
 
           »30 sets of the most technologically advanced machining CNC milling machines;

           »30 sets of Multi-Spindle Japan Precision Swiss CNC lathes.

           Our service

           1.Competitive price: we would always try our best to meet your target price.

           2.Short lead time: around 10-30 days(according the order quantity).

           3.Prompt feedback: all your emails and questions would be processed immediatly.

           4.Quality: according the given standard such as API,ASTM,DIN,EN etc.

           5.Flexible payment terms: TT/LC or others ( negotiate with purchaser)

           6.Inspection: Third Party Inspection or customer of inspection both ok.

           7.Documents: MTC,Packing list,Commercial invoice and CO.
 

OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler for Building Tube Pipe Material

 
Warranty
1 Year
After-sale Service
Online technical support
Project Solution Capability
graphic design, total solution for projects
Application
Outdoor
Design Style
EUROPEAN
Place of Origin
China
Color
Silver
Size
48.3
Material
Q195 / Q235 / Q345
package
steel pallet,carton,plywood case,as request
Supply capacity
5000pieces a day
Surface treatment
electro galvanized
standard
EN74/BS1139



OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler for Building Tube Pipe Material       RFQ
      Customer Inquiry →Engineering Communication →Cost Analysis →Sales Analysis →Quote to Customer
      » 1-3 Work Days Only
      » Submit RFQ with complete commercial terms
     Sample Making
     Sample Order → Engineering Review → Sample Plan to Customer → Sample Status Tracking → 
     Submit Samples with Doc.

     » Tooling L/T: 2-4 weeks, Sample L/T: 1 week
     » Continuous Sample Status Tracking
     » Complete Documents for sample approval
     Order Management CRM System → Open Order Confirm → Logistic Arrangement.
     » Production L/T: 2-4 weekends
     » Weekly Open Order Confirm
     » Preferred 3PL Service to Customers


OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler for Building Tube Pipe Material        Shipping 

        1. FedEx/DHL/UPS/TNT for samples, Door-to-Door;

        2. By Air or by Sea for batch goods, for FCL; Airport/ Port receiving;
 
        3. Customers specifying freight forwarders or negotiable shipping methods!
 
        Delivery Time: 3-7 days for samples; 5-25 days for batch goods.

        Payment: 
        1.T/T, MoneyGram,PayPal; 30% deposits; 70% balance before delivery.

        2. By Air or by Sea for batch goods, for FCL; Airport/ Port receiving;
        3. Customers specifying freight forwarders or negotiable shipping methods!
        Delivery Time: 3-7 days for samples; 5-25 days for batch goods.


OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler for Building Tube Pipe Material     Q: Why choose Shengao product?
     A: We shengao have our own plant Weifang Shengao machinery Co., Ltd, therefore,
     we can surely promise the quality of every product and provide you comparable price.


     Q: Do you provide OEM Service?
     A: Yes, we provide OEM Service.

     Q: Do you provide customized forging products?
     A: Yes. Customers give us drawings and specifications, and we will manufacture accordingly.

     Q: What is your payment term?
     A: We provide kinds of payment terms such as L/C, T/T, Paypal, Escrow, etc.
  
OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler for Building Tube Pipe Material
If there's anything I can help, please feel free to contact with me.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier