OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler

Still deciding? Get samples of $ !
Order Sample
Product Details
Customization: Available
After-sales Service: Contact Us
Warranty: Contact Us
Shipping
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Guarantee
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW PayPal
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2014

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (14)
  • OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler
  • OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler
  • OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler
  • OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler
  • OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler
  • OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler
Find Similar Products
  • Overview
  • Product Description
  • FAQ
Overview

Basic Info.

Model NO.
WF-SA
Application
Machine Parts, Transportation, Decorations
Certification
CCC, CE, ISO
Surface Treatment
Yes
Technics
Casting
Material
Metal
Type
Fasteners
Item
Scaffolding Coupler
Molding Style
Forging
Molding Technics
Pressure Casting
Heat Treatment
Quenching
Forging Tolerance
+/-0.5mm
Standard
ASME
Brand Name
Shengao, OEM
Raw Material
Steel
Techincs
Forging
Factory
Over 15 Years'experience
Certificate
SGS, CE, ISO 9001:2008
Delivery Time
15 Days After Receiving The Payment
Service
OEM and ODM
Export Markets
Global
OEM Package
Composite Wood Box
Transport Package
Plywood Box
Specification
SGS
Trademark
ShengAo
Origin
Weifang, Shangdong, China
HS Code
8483500000
Production Capacity
50000PCS/Month

Packaging & Delivery

Package Size
40.00cm * 50.00cm * 60.00cm
Package Gross Weight
50.000kg

Product Description

OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler for Building Tube Pipe Material

Product Description

Mainly engaged in the development, production and sales of all kinds of forgings, mechanical accessories,

auto parts. The company has production department, quality inspection department, marketing department,
machining workshop, blanking workshop, heat treatment workshop, forging workshop, testing center and
physical and chemical laboratory. Through years of development, the company has made great progress,
not only Shengao Metal Parts is sold well in the US,but we have customers all over the world. Our
aftermarket parts meet OEM specifications for reliable performance, while often costing substantially 
less than OEM counterparts.

Our Metal Parts can deliver exceptional value because we offer factory direct pricing without a middleman
markup. We also stand behind the quality of our products with a full 6 months warranty.


OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler

           Equipment
           »80 sets of CNC turning machines;
 
           »30 sets of the most technologically advanced machining CNC milling machines;

           »30 sets of Multi-Spindle Japan Precision Swiss CNC lathes.

           Our service

           1.Competitive price: we would always try our best to meet your target price.

           2.Short lead time: around 10-30 days(according the order quantity).

           3.Prompt feedback: all your emails and questions would be processed immediatly.

           4.Quality: according the given standard such as ASTM,DIN,EN etc.

           5.Flexible payment terms: TT/LC or others ( negotiate with purchaser)

           6.Inspection: Third Party Inspection or customer of inspection both ok.

           7.Documents: MTC,Packing list,Commercial invoice and CO.
 

OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler

 
Warranty
1 Year
After-sale Service
Online technical support
Project Solution Capability
graphic design, total solution for projects
Application
Outdoor
Design Style
EUROPEAN
Place of Origin
China
Color
Silver
Size
48.3
Material
Q195 / Q235 / Q345
package
steel pallet,carton,plywood case,as request
Supply capacity
5000pieces a day
Surface treatment
electro galvanized
standard
EN74/BS1139



OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler       RFQ
      Customer Inquiry →Engineering Communication →Cost Analysis →Sales Analysis →Quote to Customer
      » 1-3 Work Days Only
      » Submit RFQ with complete commercial terms
     Sample Making
     Sample Order → Engineering Review → Sample Plan to Customer → Sample Status Tracking → 
     Submit Samples with Doc.

     » Tooling L/T: 2-4 weeks, Sample L/T: 1 week
     » Continuous Sample Status Tracking
     » Complete Documents for sample approval
     Order Management CRM System → Open Order Confirm → Logistic Arrangement.
     » Production L/T: 2-4 weekends
     » Weekly Open Order Confirm
     » Preferred 3PL Service to Customers


OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler        Shipping 

        1. FedEx/DHL/UPS/TNT for samples, Door-to-Door;

        2. By Air or by Sea for batch goods, for FCL; Airport/ Port receiving;
 
        3. Customers specifying freight forwarders or negotiable shipping methods!
 
        Delivery Time: 3-7 days for samples; 5-25 days for batch goods.

        Payment: 
        1.T/T, MoneyGram,PayPal; 30% deposits; 70% balance before delivery.

        2. By Air or by Sea for batch goods, for FCL; Airport/ Port receiving;
        3. Customers specifying freight forwarders or negotiable shipping methods!
        Delivery Time: 3-7 days for samples; 5-25 days for batch goods.


OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler

FAQ

Q1: What is a Scaffolding Coupler and what is its function?
A: A Scaffolding Coupler is a critical load-bearing component used to securely connect two scaffold tubes (pipes) together, forming a rigid and stable scaffold structure. Its primary function is to transfer forces between tubes, ensuring the integrity and safety of the entire system. Proper coupler selection and installation are essential for structural stability.

Q2: What are the main types of couplers and their uses?
A: The three fundamental types, as defined by major standards (BS/EN), are:

  • Right-Angle Coupler (Double Coupler): Used to connect two tubes at a 90-degree angle. It is the primary coupler for connecting ledgers (horizontal) to standards (vertical tubes). This is the only type considered load-bearing for right-angle connections.

  • Swivel Coupler (Swiveling Double Coupler): Used to connect two tubes at any angle (other than 90°), such as for diagonal braces (bracing). It consists of two parts that pivot.

  • Sleeve Coupler (Joint Pin): Used to join two tubes end-to-end in a straight line to create a continuous load-bearing member (e.g., lengthening a standard or ledger).

Q3: Are there other common types?
A: Yes, complementary types include:

  • Putlog Coupler (Single Coupler): Used to attach a single transom (putlog) or board bearer to a ledger. It has one fixed jaw and one sliding jaw.

  • Girder Coupler (Beam Clamp): Specifically designed to clamp onto the flange of an I-beam or universal beam, providing a secure anchor point for the scaffold.

  • Base Plate: A plate fixed to the bottom of a standard to distribute the load to the ground or supporting surface.

Section 2: Material, Standards & Compliance

Q4: What materials are couplers made from, and how are they protected?
A: High-quality couplers are typically forged from low carbon steel or alloy steel for high strength and ductility. The standard corrosion protection is hot-dip galvanizing (HDG), providing a durable, thick zinc coating suitable for harsh outdoor and industrial environments.

Q5: What does the Safe Working Load (SWL) mean, and what is the typical load capacity?
A: The SWL is the maximum load the coupler is certified to sustain under normal use. According to BS EN 74-1, a standard right-angle or swivel coupler must withstand a minimum slip load of 6.25 kN and a minimum ultimate load of 15 kN. Sleeve couplers have higher tension/compression requirements. Always check the manufacturer's certification.

Section 3: Selection, Installation & Safety

Q6: How do I choose the correct coupler for my scaffold tube?
A: You must match the coupler to the tube's outside diameter (O.D.). The most common sizes are:

  • 48.3mm O.D. Tube (Scaffold Tube): Use a 50mm Coupler (nominal size). This is the industry standard.

  • 42.4mm O.D. Tube (Tube & Fitting): Use a 48mm Coupler.

  • 60.3mm O.D. Tube (Heavy Duty): Use a 60mm Coupler.
    Using the wrong size is extremely dangerous.

Q7: What is the correct tightening procedure?
A:

  1. Ensure the tubes are in full contact inside the coupler jaws.

  2. Tighten the nut/bolt using a scaffold spanner (wrench) of the correct size.

  3. Apply sufficient force until the coupler is "hand-tight" plus a final quarter-turn (or as per manufacturer's torque specification). The coupler should not be able to move on the tube under hand pressure.

  4. Never use a pipe extension ("cheater bar") on the wrench, as overtightening can damage the coupler or tube.

Q8: Can couplers be used on damaged or corroded tubes?
A: NO. Couplers must only be used on tubes that are in good condition:

  • No excessive corrosion (especially pitting).

  • No dents, bends, or cracks.

  • No paint, concrete, or heavy dirt that prevents full metal-to-metal contact.
    Using damaged components compromises the entire structure's safety.

Section 4: Inspection, Maintenance & Lifespan

Q9: How often should couplers be inspected?
A: They require pre-use inspection before each project and regular formal inspections (e.g., weekly, after extreme weather, or if damaged). A competent person must perform these inspections.

Q11: What should I look for during an inspection?
A:

  • Cracks or deformations in the forging.

  • Wear on the jaws or threads.

  • Corrosion that reduces the cross-sectional area.

  • Damaged, stretched, or missing nuts/bolts.

  • Distortion or bending of the bolt.
    Any defective coupler must be immediately tagged and removed from service.

Q10: What is the typical service life of a coupler?
A: There is no fixed calendar lifespan. Service life depends entirely on usage conditions, frequency of inspection, and maintenance. A well-maintained, hot-dip galvanized coupler used within its SWL and stored properly can last for many years. Lifespan is determined by condition, not age.


  
OEM Construction Carbon Steel Stamping Forging Scaffold Clamp Scaffolding Coupler
If there's anything I can help, please feel free to contact with me.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Send Inquiry
Chat Now