Customization: | Available |
---|---|
Application: | Aerospace Industry, Agricultural Equipment, Automotive Industry, Construction Industry, Marine Industry, Medical Industry, Robotics Industry |
Corrosion Resistance: | Low Corrosion Resistance |
Still deciding? Get samples of US$ 150/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Our service:
Product Description
Item | Shaft |
Application | Cranes, Railway way, mineral Machinery, hydraulic Machinery, Spare parts etc. |
Design | Can be at the customer' request, tailor-made, at customer's design |
Material | Stainless Steel, Carbon Steel or Alloy Steel, such as 45#, 65# SAE4140, SAE4150, SAE4160, 42CrMo, stainless steel 410, stainless steel 304, or other required steel |
Size | Diameter 10mm to 1000mm. Length max.in 6000mm |
Advantages | »Reliable Forging/CNC Machining service »Good machining quality »Reasonable Pricing provided »Competitive shipping cost service »MOQ 1PCS and small quantity order accepted »Professional engineering service when any modification required »Any turnkey assembly or customized package requirements, we'll meet your demands! |
|||||
RFQ | Customer Inquiry →Engineering Communication →Cost Analysis →Sales Analysis → Quote to Customer » 1-3 Work Days Only » Submit RFQ with complete commercial terms |
|||||
Sample Making | Sample Order → Engineering Review → Sample Plan to Customer → Sample Status Tracking → Submit Samples with Doc. » Tooling L/T: 2-4 weeks, Sample L/T: 1 week » Continuous Sample Status Tracking » Complete Documents for sample approval |
|||||
Order Management | CRM System → Open Order Confirm → Logistic Arrangement. » Production L/T: 4-8 weeks » Weekly Open Order Confirm » Preferred 3PL Service to Customers |
|||||
Quality Control | Certificates: RoHS, ISO9001:2008, SGS. IQC → IPQC → OQC/FQC → Quality Complain Feedback → Audit & Training. » Plant Audit and Qualified by world famous company » Strict Quality Management Procedure with Traceability |
|||||
Application | »Aerospace »Marine »Motorbike »Automotive »PhotoGear »EDC Tools » lighting fittings »Medical equipment »Telecommunication »Electrical & Electronics »Fire detection system, etc. |
FAQ:
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI. we will request you to arrange payment by T/T.
3) What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pre-paid full payment or 30% deposit before we go into production. After we get the deposit, we start to process the order. We usually need 4-8 weeks if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, start to prepare the shipment for you, and the balance payment should be settled before delivery.
4) How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace them in next shipment.
5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure. And all the goods will be tested after welding, assure 100% no leaking problems.