Shandong, China
Business Type:
Manufacturer/Factory & Trading Company
Number of Employees:
36
Year of Establishment:
2006-03-31
Management System Certification:
ISO9001:2008
Average Lead Time:
Peak season lead time: one month
Off season lead time: one month
OEM/ODM Service
Sample Available

Welding, Welding Machine, Welder manufacturer / supplier in China, offering ISO9001 Certificated Steel Structural Welding Parts, 2t Forging Steel Multi-Function Chain Tensioner Cable Wire Rope Tensioner Device, 4t Safe Load Universal Maritime Cable Tensioner Multifunction Double Hook Chain Tensioner and so on.

Diamond Member Since 2014
Audited Supplier
Supplier Homepage Products Welding Parts ISO9001 Certificated Steel Structural Welding Parts

ISO9001 Certificated Steel Structural Welding Parts

Purchase Qty. / Reference FOB Price
100-1,999 Pieces US $5
2,000+ Pieces US $4
Port: Qingdao, China
Production Capacity: 50000PCS/Month
Payment Terms: L/C, T/T, D/P, Western Union, Paypal
Type: Cold Stamping
Processing Type: Shaping Metal
Material: Carbon Steel
Mould: Multistep Progressive Dies
Surface Processing: Polishing
Fine Blanking: Double Acting

You Might Also Like

Loading...

Basic Info

Model NO.
Customized
Process
Forming Process
Industry
Metal Stamping Parts
Tolerances
0.2mm
Customized
Customized
Item
ISO9001 Certificated Steel Structural Welding Part
Raw Material
Carbon Steel
Tolerance
+-0.02 or as Drawings
Technology
Stamping + Welding
Service
Shengao, OEM
Color
Nature or as Request
Export Markets
Global
OEM and ODM
100% with Drawings
Inspection
Slide Caliper, Microcaliper, Projector
After Sale Service
Reply Within 24hours, Solution Within48
Trademark
ShengAo
Transport Package
Plywood Box
Specification
CE, SGS
Origin
Weifang, Shangdong, China
HS Code
87089910

ISO9001 Certificated Steel Structural Welding Parts

1. High quality. ISO9001-2008
2. Competetive price
3. OEM service.
4. Process: Precision made. Experience & Reasonable QC that you can reply on.
5. Adequate supply capacity. Punctual delivery time.


Advantages:
1. We are ODM&OEM, design according to your drawing.
2. Rich experience and good technology support(engineers with more than 20 years 
experience).
3. Manufacturer and Trade Company.
4. Low MOQ is accepted.
5. 100% inspection before delivery.
6. Competitive price with high quality.
7. Convenient transportation (Qingdao, NIngbo, Shanghai). 


Our products
---Custom fabricated sheet metal products
---Equipment and electrical enclosures
---Metal covers, metal boxes and cabinets
---Metal panels
---Fiber distributor box
---Water treatment purifier frames
---Custom metal shelving & brackets
---Metal electronics components
---Printer housing, Air conditioning housing. 
---Bank, telecommunication service terminal Cabinets
---Communications equipment
---Scientific equipment
---etcs

ISO9001 Certificated Steel Structural Welding PartsISO9001 Certificated Steel Structural Welding Parts
Product type:stamping parts
Material:Stainless steel, alloy steel, aluminum
Surface treatment:brush finish, oxidation, screen printing, laser, sand blasting, galvanized
Color:Black,Red,Yellow,Blue,Pink,Natural color
Precision tolerance:+/- 0.1
A. Raw MaterialCopper ,BeCu, phosphor copper, Brass, Stainless steel, Aluminum, SGCC, SECC, steel, spring steel, Nickel-Silver... and all different kinds of metal;
B. SPEC Roll material thickness is 0.05-10mm;sheet metal  thickness is 0.3-20mm;
C. Surface treatmentGold / Silver /Tin / Nickel / Zinc /  Chromium / Copper-plating /  Laser etching/Screen printing/Phosphating (can pass salt spray testing with 160 hours)/Black coating / Painting/ Power coating /Electrophoresis /  Passivating /Deburring /  Polishing /  Brush according to ROHS standard;
D. ApplicationAll different kinds of telecom products, loom, furniture, and so on ;
E. QuotationPlease provide the Formal drawings (normally, with DWG/STP/PDF file ),and make note with material/QTY/surface treatment and any other requirements, we will provide you the quotation sheet in 48-72 hours;
F. Prototype & MouldWe make the prototypes or moulds according to the drawings that confirmed by both of us and customers! The lead time is depends on the structure and qty of parts, Normally, lead time for prototypes is 3-15 days; lead time for mould is 10-25 days;
G. ProductionWe will provide samples according to the drawings to customers for approval. Then arrange the production  and confirm the delivery date according to the Purchase Order; Normally , the lead time for production is 5-30 days ,the structure of parts is different , the lead time will be different .
H. PackagePlastic bags; Preserving Box; Reel/tape package; Plastic tray; Wood box; Export carton and any other customized package according to the customers' requests.

ISO9001 Certificated Steel Structural Welding Parts

ISO9001 Certificated Steel Structural Welding Parts
ISO9001 Certificated Steel Structural Welding Parts
ISO9001 Certificated Steel Structural Welding Parts

Q: Why choose Shengao product?
A: We shengao have our own plant-- Weifang Shengao machinery Co., Ltd, therefore, we can surely promise the quality of every product and provide you comparable price.

Q: Do you provide OEM Service?
A: Yes, we provide OEM Service.

Q: Do you provide customized products?
A: Yes. Customers give us drawings and specifications, and we will manufacture accordingly.

Q: What is your payment term?
A: We provide kinds of payment terms such as L/C, T/T, Paypal, Escrow, etc.



If there's anything we can help, please feel free to send inquiry, thanks in advance!

Send your message to this supplier

*From:
*To:
avatar Miss Sharon Zhao
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now