Customization: | Available |
---|---|
Standard: | GB, EN, China GB Code, ASME |
Tolerance: | +/-0.10mm |
Still deciding? Get samples of US$ 5/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
»Reliable service
»Good production qualityManufacturing Process | Laser cutting/NCT/Punching, sharping, bending, threading, welding, polishing, tapping, riveting, surface finishing, assembly, pacing |
Material | Stainless steel, SPCC/SGCC, copper/brass, aluminum for option (according to customer's requirements for special material) |
Surface Treatment | Galvanized (zinc-plated, nickel-plated, chrome-plated, silver-plated), powder coating/oil painting, polishing (mirror polishing, electrolytic polishing), brushing, sandblasting, hot-dip galvanized |
Tolerance | +/-0.01mm or special requirements |
Package | PE Bag, Paper carton box, plywood case/pallet/crate |
Application | Auto parts, electronic products, power supply, industry cabinet, construction, etc |
Quality Control | ISO9001 |
Drawing File Format | Solidworks, Pro/E, Auto CAD, PDF |
Features |
|
Inspection | IQC, QPC, FQC, OQA |
Delivery time | 10-20days |
Quality Insurance | One Year |
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI. we will request you to arrange payment by T/T.
3) What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pre-paid full payment or 30% deposit before we go into production. After we get the deposit, we start to process the order. We usually need 1-5 weeks if we dont have the items in stock. Before production has been finished, we will contact you for shipment details, start to prepare the shipment for you, and the balance payment should be settled before delivery.
4) How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace them in next shipment.
5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure. And all the goods will be tested after welding, assure 100% no leaking problems.