Customization: | Available |
---|---|
Die Casting Machine Type: | Hot Chamber Die Casting Machine |
Die Casting Method: | Precision Die Casting |
Still deciding? Get samples of US$ 3.19/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. No glitches:It has advanced deburring equipment and reprocessed by hand. Let each product be clean without leaving burrs
1.Review the part design,drawings and quality standard from clients.
2. Mould and Tooling design & manufacturing
3. Mould and Tooling testing & confirm the sample
4. Die casting raw castings
5.Surface treatment: Trimming,Deburring, polishing, cleaning, passivation & power coating
and other requirement from Customer
6. Precision machining: CNC lathes, milling, drilling, grinding etc
7. Full Inspection
8. Packing
9. Delivery
Material | Aluminum Alloy ADC12 ,A380, Al 6061 |
Surface Treament | Anodising, powder coating, sand blasting, painting |
Part Weight | from 3 g --- 20kgs |
Application | Industry fittings and Construction and Decoration. |
Casting Machine | 200-1200 tons |
Capability | Output 100 tons per month. |
New Moulds | Opening new mould about 30 days . |
Fabrication | Die designing→Die making→Smelting&alloying→QC→Die casting→remove burrs →QC→Surface treatment→QC→Packing→QC→Shipping→After Sale Service |
Deep Processing | CNC / Cutting / Punching / Checking / Tapping / Drilling / Milling |
Certification | 1. ISO 9001:2015; |
2. GB/T28001-2001(including all the standard of OHSAS18001:1999); | |
3. GB/T24001-2004/ISO 14001:2004; | |
4. GMC. | |
MOQ | As custimer's . Usually 10-12 tons for a 20'FT; 20-23 tons for a 40HQ. |
Free Samples | YES |
Payment | 1. T/T: 50% deposite, the balance will be paid before delivery; |
2. L/C: the balance irrevocable L/C at sight. | |
Delivery time | 1. Mould: 35-45 days |
2. Bulk Order: 30-40 days | |
OEM | Available. |
Shipping way:
1) 0-100kg: express&air freight priority,
2) >100kg: sea freight priority,
3) As per customized specifications
Packing & Delivery:
1.Packing Detail: Each product packed with plastic preservative, EPE, foam plastic bag, Carton outside, wood case or iron case or as per the customer's special requirement. Besides, the custom package takes a week to prepare in advance.
2.Delivery Detail: the fast International Shipping time takes 3 ~5 working days by DHL/UPS/FedEx, slow shipping time takes 7~ 8 working days by DHL/UPS/FedEx/TNT, etc
1. Q: Why choose Shengao product?
A: We shengao have our own plant Weifang Shengao machinery Co., Ltd, therefore, we can
surely promise the quality of every product and provide you comparable price.
2. Q: Do you provide OEM Service?
A: Yes, we provide OEM Service.
3. Q: Do you provide customized products?
A: Yes. Customers give us drawings and specifications, and we will manufact accordingly.
4. Q: What is your payment term?
A: We provide kinds of payment terms such as L/C, T/T, Paypal, Escrow, etc.
Please contact us if you have any demand.