Forged Track Clamp Railway Spring Clips Steel Rail Clip for Railway Fastening

Product Details
Customization: Available
After-sales Service: Contact Us
Warranty: Contact Us
Still deciding? Get samples of US$ 10/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
48
Year of Establishment
2022-08-15
  • Forged Track Clamp Railway Spring Clips Steel Rail Clip for Railway Fastening
  • Forged Track Clamp Railway Spring Clips Steel Rail Clip for Railway Fastening
  • Forged Track Clamp Railway Spring Clips Steel Rail Clip for Railway Fastening
  • Forged Track Clamp Railway Spring Clips Steel Rail Clip for Railway Fastening
  • Forged Track Clamp Railway Spring Clips Steel Rail Clip for Railway Fastening
  • Forged Track Clamp Railway Spring Clips Steel Rail Clip for Railway Fastening
Find Similar Products
  • Overview
  • Product Description
  • Our Advantages
  • FAQ
Overview

Basic Info.

Model NO.
WF-SA
Customized
Customized
Certification
ISO14001, ISO9001
Type
Tie Plate
Processing Object
Metal
Molding Style
Forging
Molding Technics
Pressure Casting
Application
Rail Pressing Clamp
Material
Steel
Heat Treatment
Tempering
Surface Treatment
Oxidation
Forging Tolerance
+/-0.2mm
Standard
ASME
Use
Railway Parts
Process
Forging
Shape
Round, Square, etc.
Dimensions
as Your Requirement
Quality Control
100% Inspected
Advantages
OEM and Customized
Transport Package
Pallet, Iron Frame, Plywood Box.
Specification
SGS, ASTM, DIN, ISO9001: 2015, EN124, CE, GB
Trademark
Shengao
Origin
Weifang City, Shandong Province
HS Code
87089910
Production Capacity
50000PCS/Month

Packaging & Delivery

Package Size
20.00cm * 10.00cm * 5.00cm
Package Gross Weight
5.000kg

Product Description

          Forged Track Clamp Railway Spring Clips Steel Rail Clip for Railway Fastening
 
Product Description

 

 
1.material:steel, 60Si2Mn   60Si2CrA     55Si2Mn
2.hardness :Hrc 41-46
3.function,rail fastener
4.certificate:ISO9001:2008,CRCC
5.packing: Tie up by iron wire, knit bags(less than 50 kg) ,if need ,then coated on tray or according to customer's request.
6.finishing anti-rust and anti-corrosion pre-treatment or according to customer's request

 7.can make as customer's drawing

8.MOQ:10000PCS

 9.competive price and best service

A rail clip is used to fasten the rails to the underlying base plate together with the concrete sleeper. Usually, rail clips are made of forged spring steel which is produced by the hot forging process. Because of the uniform microstructure of forged clips, it is considered to be better than other metal-forming process.
Forged Track Clamp Railway Spring Clips Steel Rail Clip for Railway Fastening

Rail Clip Type Clip Size        Material
E Clip E1609 E1809 E1817 E2001 E2006 E2009 E2055 E2056

60Si2Mn
 
 
SKL Clip            SKL1 SKL2 SKL3 SKL12 SKL14 SKL75  
W Clip Deenik Clip  Fast Clip  Russia Clip  China  Clip 

Forged Track Clamp Railway Spring Clips Steel Rail Clip for Railway FasteningForged Track Clamp Railway Spring Clips Steel Rail Clip for Railway FasteningForged Track Clamp Railway Spring Clips Steel Rail Clip for Railway Fastening

HOW DO WE PRODUCE RAIL CLIP?

Raw material: Premium grade spring steel sourced from a reliable and certified long-term producer.
Shearing: The spring steel bar has to be sheared as per the length required. Heating: to forging temperature (950-1000 degrees Celsius), but overheating shall be avoided to check decarburization.
Forming: The properly heated bar is transferred to the power press for forging.
Hardening: The forged rail clips are transferred to the quenching tank. Dimensional accuracy and quench hardness of rail clips are checked before tempering.
Tempering: The rail clips are tempered at about 350 Celsius to achieve appropriate toughness in the spring. Inspection: The products are then checked thoroughly as per China CRCC and customer-required specifications and designs.
Packing: Clips can be packed in woven bags or upon customer requirement. Inspection during the production process

Forged Track Clamp Railway Spring Clips Steel Rail Clip for Railway Fastening

Quality Control 1. Raw Materials Test, including chemical composition and size; 
2. Random inspection during production; 
3. Final products size test, with measurement tools, special gauges and Coordinate instrument if needed; 
4. Final product Strenght and Hardness test, to guarantee the mechanical property; 
5. Assembly and Function test, with special testing gauges; 
6. Packing test

din rail mounting clips rail clip,din rail mounting clip,elastic rail clip,rail spring clip,crane rail clips,din rail clip,curtain rail clips,elevator rail clips,rail track clips,glass railing clip,elevator guide rail clip,railway steel rail track spring clip,rail fasteners rail clips,stainless steel railing glass clip,e1809 rail clip,rail fixing clip,forged rail clip,railing glass clip
Forged Track Clamp Railway Spring Clips Steel Rail Clip for Railway Fastening

Our Advantages

 

Our Services
      1. Long-standing reputation in this field.
      2. Specialization is standard and accurate to meet your requirement.
      3. OEM quality standard guaranteed.
      4. Product upgrading and expansion of species.
      5. Good quality with competitive prices.
      6. Flexible and convenient logistic service.
      7. Excellent and high-quality control.
      8. Long-lasting working lifetime.
      9. Sufficient storage.
     10. Original truck spare parts and professional manufacture.
     11. High technology and stable performance.
     12. Various sizes and models are available.

Forged Track Clamp Railway Spring Clips Steel Rail Clip for Railway Fastening
 

FAQ

 

FAQ:
1. Are you a genuine manufacturer?

Yes, all products shown in our website are produced in our ISO9001:2015 certified factory; We are also a company registered by China Customs with the right to export and import.  

2. I want to keep our design confidence; can we sign NDA?
Sure, protecting customers' profit is our obligatory responsibility, signed NDA would be valid for both of us. 

3. What should I offer to get your quotation?
Please offer us your detailed information for the product, such as drawings with 2D/3D by software Pro/E, Auto CAD, SolidWorks, UG etc; as well as materials, surface treatment, quantity, and package. Any special requirements should be highlighted especially for tolerance.  

4.How long does it take to receive samples?
20 working days,the lead time is the general production period and does not include the transportation time.
we can supply free samples with less quantity,but customers need to pay shipping cost.

5. How long is the manufacturing lead time?
Mass Production:30-45 working days after sample approval by yours.T
he lead time is the general production period without the transportation time.

We could make some special production arrangements effectively if the customer has an urgent need.

6. How long does it take to ship goods from China by sea?
It takes about 5 weeks to European ports plus 1 week for customs clearance, so you can get the container within 6 to 7 weeks.
It takes about 2 weeks to east coast and 3 weeks to west coast US ports. All sea goods are shipped from Qingdao/Shanghai/Ningbo Port.


7. How long does it take to ship goods from China by air?
It takes about 7 days to all major destinations.

8. What are the payment terms?
Payment terms are negotiable and will improve for long-term customers.
During the initial stages, we request 50% of the tooling fee in advance with the balance payable on acceptance of samples.
Bulk production orders can be negotiable. We prefer a 30% deposit and the balance by T/T before delivery.


9. New product development process
Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept. To ensure the developing schedule---Design mold, fixture, and gauge and make them in our factory--- mold. fixture and gauge making---producing samples---approved from customer-purchasing material-forging-heat treatment-shot blasting-machining-Inspection-package---delivery


10. Which countries do you export to?
Now mainly exports to the U.S.A, Germany, France, Italy, the UK, Brazil, Swedish, Japan, Korea, Middle East of Asia, Thailand, and so on.

11. Can we visit the factory to conduct an audit?
Yes, you are welcome to visit our factory.

All parts are made according to the customer's drawings or samples. If you have any parts to be made, please feel free to send your kind drawings/samples to us. Technical drawings including material mark, Product weight, and Purchase quantity. The comprehensive information will help us quickly calculate an accurate and reasonable price for you.


We also provide our customers with remarkable OEM solutions to meet a variety of requirements. 
We believe our product quality and price will be able to enlarge your competitive power in your market.

 Quality First, Price Best, Service Foremost!
 We assure you of our best services at all times!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier